BART is back with some completed Hayward Yard shots!
After a long hiatus, the BART project is back on! I have cut down on the polys for my ballasted track, so I finally completed Hayward yard just a few minutes ago. What halted the project in the first place was those hi-poly tracks I created, with the main culprit being the curved 3rd rail coverboards. So, for the sake of the game, I'll be modifying them to be somewhat pentagonal, because it'll take up less polys. The old tracks were 1,800 polys---the new ballasted ones---only 300 (including the third rail)! So, the only new tracks are the ballasted ones featured in the screenshots below. I will change these later on to gray ballast, as I haven't recolored the original textures yet. I have to replace all of the other assets and rebuild from the ground up, since all of my BART projects except the B/C cars and the L-line stations were lost when my old external HD decided to die over the summer. Enjoy these shots of the Hayward Yard, and expect building to commence in both directions, hopefully reaching Fremont by tomorrow evening, and the Lake Merritt mini-yard and tunnel portal by late next week. Big thanks to my contacts at BART for helping out again!
Overhead shot looking South
A lonely mid-consist C car
Employee pick up/drop off platforms. Transfer tracks 03-07 to the right. They dispatch southbound trains only.
Southern end of Transfer tracks 03-07, with car wash visible
End of car wash becomes transfer track 08
Overhead view of Southern end of the yard. Tracks way north are Hayward Test track and non-revenue shop tracks. Haven't confirmed their use yet.
Some night time shots--
Looking towards the Hayward Shops
S&I building in the far upper right
Southern view looking from storage tracks
Enjoy!
-A :wave: