This will be the official W.I.P. build thread for the Chama to Antonito line. This will be as the Rio Grande had it in the late 40s/early 50s time frame. The route will be after the roundhouse at Chama was reduced in size the first time, but before the final change when the turntable was removed.
The route will be built using the map by Fishlipsatwork. As always any help or constructive suggestions are welcome.
Right now, I will be getting help from these fine folks:
Taylor871 - Doing Research
Bendorsey - Doing what he does best!!!
Anyone else wishing to contribute, please feel free to let me know.
Updates Coming.....Chris
(P.S. I know I didn't put a screenshot in this first message, but do you really need one of the DEM?)
The route will be built using the map by Fishlipsatwork. As always any help or constructive suggestions are welcome.
Right now, I will be getting help from these fine folks:
Taylor871 - Doing Research
Bendorsey - Doing what he does best!!!
Anyone else wishing to contribute, please feel free to let me know.
Updates Coming.....Chris
(P.S. I know I didn't put a screenshot in this first message, but do you really need one of the DEM?)