neilsmith749
Active member
Can't wait to get my hands on this one Neil. Outstanding looking layout
Jack
If you're interested, Jack, you'll be the first to test it!
Hope you're feeling better!
:wave:
n
Follow along with the video below to see how to install our site as a web app on your home screen.
Note: This feature may not be available in some browsers.
Can't wait to get my hands on this one Neil. Outstanding looking layout
Jack
I want it, I want it. Send it, send it. I'm feeling better and will doer from my bed if needed. Lol
Jack
Guess I should check and or use these forums a bit more often.
Neil, your work looks amazing. I tried making the Union east to Ajax line once but it never panned out.
Looking forward to the day you release this thing
Fantastic work Neil. Being from the general area you are modeling I must say you're certainly capturing the flavour of the area very well.
Hey Hoseclamp, haven't heard from you in months. I PM'ed you back in June to tell you your great CN location signs don't work (won't show up in surveyor), even though they don't show up as faulty/missing assets in the CMP.
Hi Transportfan. Yes you are correct ... I haven't been around for quite a while. I got a new job and it has kinda knocked the heck out of my spare time. I'm just now actually finding a bit of time to return to some my train sim projects. Yours is the first I've heard of problems with my CN Station Signs. They work fine for me, so I'm not sure. If anybody else is having problems using them I'd sure like to hear from them!
And to Neil ... yes the Ford yard in Oakville is a bear. At one time I had started building the Halton, Oakville and Grimsby Subs as one LARGE route. I had all mainline track laid from Toronto to Niagara Falls plus most sidings and spurs. I only had Oakville yard about half laid and I can say from experience it's ALOT of work. However I scrapped that entire projet to move on to my current project which is the Bala Sub from Mac Yard to Washago and the Newmarket Sub from Washago to North Bay (mostly since I grew up railfanning on these lines). I've completed the North Bay yard trackwork and have started on Mac ... just remember that when you think YOU have it bad doin Oakville!!!
Haha - I'm not going for sympathy or anything - just being realistic! I think it'll turn out okay. Plus, I'm nearing the end of phase one, (toronto to oakville) so I'm kind of really looking forward to finishing.
That's quite a lot you've bitten off! Is it actually to scale? - I hope you'll be able to upload it to the dls - I'd love to see it!
n
Hi Transportfan. Yes you are correct ... I haven't been around for quite a while. I got a new job and it has kinda knocked the heck out of my spare time. I'm just now actually finding a bit of time to return to some my train sim projects. Yours is the first I've heard of problems with my CN Station Signs. They work fine for me, so I'm not sure. If anybody else is having problems using them I'd sure like to hear from them!
And to Neil ... yes the Ford yard in Oakville is a bear. At one time I had started building the Halton, Oakville and Grimsby Subs as one LARGE route. I had all mainline track laid from Toronto to Niagara Falls plus most sidings and spurs. I only had Oakville yard about half laid and I can say from experience it's ALOT of work. However I scrapped that entire projet to move on to my current project which is the Bala Sub from Mac Yard to Washago and the Newmarket Sub from Washago to North Bay (mostly since I grew up railfanning on these lines). I've completed the North Bay yard trackwork and have started on Mac ... just remember that when you think YOU have it bad doin Oakville!!!
I am not sure about this line but does it go in to the streetsville cp yard?
Because i was wondering if anyone could add that and have a line that runs up from there north to Orangeville. just wondering great job guys keep it up