strench707
TCR Content Creator
Hello all!
I have run into a slight snag. As many of you may know this mainline has service roads/paths paralelling it for almost the entire duration.
So I am looking for some (or any) types of service roads.
1. I need both a dirt one and for the mainline definatly a gravel one (gray)
2. They should be about 1 lane or at least skinnier than 2 because they aren't meant for much traffic
3. Preferably traffic disabled but anything will do (if its less than 2 lanes that probably will not be a problem)
4. Poly count and framerates dont matter as of now.
In other news:
I just decided to take the Corridor up to Seabrook, MD which is right after New Carrolton, MD. Its not more than 3 miles up the line and is a MARC station. I installed portals at the end so when I test signalling it wont screw up. I promise I will try to finish all scenery before I expand north because, I need to pace myself. I just figured that I needed at least two stops along the electrified line to be sufficent for the phase 1 release.
Also, with the trees working nicely scenery is going great and at a slightly quicker pace. This does not mean I will set a release date for phase 1.
Pictures maybe this weekend (however I will be quite busy with Boy Scouts stuff.
Anyways, any help with those questions will be greatly appreciated.
Thanks
Davis
I have run into a slight snag. As many of you may know this mainline has service roads/paths paralelling it for almost the entire duration.
So I am looking for some (or any) types of service roads.
1. I need both a dirt one and for the mainline definatly a gravel one (gray)
2. They should be about 1 lane or at least skinnier than 2 because they aren't meant for much traffic
3. Preferably traffic disabled but anything will do (if its less than 2 lanes that probably will not be a problem)
4. Poly count and framerates dont matter as of now.
In other news:
I just decided to take the Corridor up to Seabrook, MD which is right after New Carrolton, MD. Its not more than 3 miles up the line and is a MARC station. I installed portals at the end so when I test signalling it wont screw up. I promise I will try to finish all scenery before I expand north because, I need to pace myself. I just figured that I needed at least two stops along the electrified line to be sufficent for the phase 1 release.
Also, with the trees working nicely scenery is going great and at a slightly quicker pace. This does not mean I will set a release date for phase 1.
Pictures maybe this weekend (however I will be quite busy with Boy Scouts stuff.
Anyways, any help with those questions will be greatly appreciated.
Thanks
Davis