Hello,
Last night and this morning I got a little more progress accomplished. I pretty much finished up what I want the SB side of Odenton to look like in the station area.
Work has commenced on the NB side. I am starting to put in staircases for access to the High Level Platforms at the station. Also, the handicap access ramps have been started on. After I finish that bit up I'll work on railings and parking. Then scenery on both sides and connecting the short distance down to the MoW base.
Also, the laying of track and ATLS enabled grade crossings for the spur off the No. 1 track to "National Plastics Co." will need to be done soon and will have scenery.
I intend to have all spurs and branches that come off the NEC to be built so that way people can do industry runs and also if Secondaries and Subdivisions of mainlines branch off (i.e. CSX's Pope's Creek Secondary) I will build them a little ways down the line and place portals until (if I ever) continue them on to their destination.
Expect screenshots this weekend, also I hope to be able to get my speed charts so I can start implementing the marvelous NEC speed signs Robby made me.
Questions? Comments? Post.
Davis