VeritechCEO
New member
I'm trying to set up a single protolars intermodel track to load both 20ft. and 40ft. containers onto flatcars. I can get the 20ft. containers to load but not the 40ft. Is it possible to to set 1 protolars track for 2 commodities or do i need to set up a second track? Also, is it possible to slow the load time so that 1 or 2 cars load ever minute instead of 1 car right after the other?