KotangaGirl
Pre-Grouping Railways Nut
Wow Mick, - you are certainly the man with the magic fingers.WIP: Great Western Railway Toddington signal box
Follow along with the video below to see how to install our site as a web app on your home screen.
Note: This feature may not be available in some browsers.
Wow Mick, - you are certainly the man with the magic fingers.WIP: Great Western Railway Toddington signal box
Chimney pot should be terracotta.WIP: Great Western Railway Toddington signal box
Thank you very much! All photographies I could find are too blur. I took it as brass...Chimney pot should be terracotta.
An absolutely amazing piece of digital model making.WIP: Great Western Railway Toddington signal box
Parker, if I can take on the insane idea of modelling the entire Southern Region of BR, NOTHING is impossible. I'll be cheering you on the entire time and let me know if you need any help with the project at all.Welcome to Bath Green Park... the beginning of a mammoth project to get the entire Somerset and Dorset Joint Railway into Trainz to a high quality, utilising HD terrain to ensure fine detailing. A joint collaboration between myself and 2995valliant, I must start by saying thank you to him for producing the DEM and related basemaps. It wasn't the most straightforward of processes but he's done a phenomenal job in producing it - I'm very much looking forward to us getting this off the ground!
These shots show, in order, an overview of Bath Green Park as it currently stands, before a full shot of the DEM is shown from Norh of Bath down to Bournemouth West. The final shot shows the local area around Bath for a sense of scale - the station is in the centre, though barely discernible. It is obviously going to be a long project, so no release is imminent any time soon but 2995valliant and I will no doubt post the odd progress shot as we go along.
The current goal is to model the mainline from Bath to Bournemouth West, though we have included a wider area to enable us to develop other routes that link in if we decide we want to do so once the main part is complete. This includes the branches to Highbridge and Burnham, the Avon Valley Railway and the East Somerset Railway. Ambitious, yes, but not impossible.
![]()
![]()
![]()
Cheers,
PLP
EeeeeeeeeeeeeeeeeeeeeeeeeekI'll get to work with Barney fleshing out whatever missing locos you're going to need to fill the local SDJR roster. Never a better time for some new Midland Region locos!!![]()
Oh those are already WELL on their way. It's impossible to stop them at this point.Thanks Tanker, I've been contemplating this for a while and when I discussed it with 2995valliant and we realised it was possible, I jumped at the chance.
That's kind of you to offer, thank you. I have a list as long as my arm of rolling stock that either doesn't exist or needs updating, but as a starting point if you want to get those Bulleid pacifics done I won't stop you...
Cheers,
PLP
An updated LMS 2Ps would be a dream for me lolOh those are already WELL on their way. It's impossible to stop them at this point.
Although if you find yourself needing a new SDJR 7F... You know where to find me.![]()
And the rest! 3F, 4F, 1P, 5MT, Black 5, Ivatt 2-6-2 to name a few...An updated LMS 2Ps would be a dream for me lol![]()
HahahaAnd the rest! 3F, 4F, 1P, 5MT, Black 5, Ivatt 2-6-2 to name a few...
Cheers,
PLP