cascaderailroad
New member
Driving my route today with four ES44's pulling a 137 car 15,000 train, it left from the start of my route in Huntingdon, got up to 37 mph, and finally reached Altoona an hour later ... When the caboose finally passed Alto Tower the train started slowing to 15 mph, and by the time it neared 1 mile of the "Curve" it was absolutely crawling, and stalled. Shoulda' added 2 Helpers on the rear, at Rose.:hehe:
No textures yet, but I'm getting tired of seeing the white TransDEM textured mountains (although that white fluffy stuff weather is comming soon to the prototype).
Screenshots and Fraps movies would be lackluster, as the scenery is still bland, for I am still tugging on terrain ... but it is comming along nicely.
Scratchy's route has better detailed looks to it though.
Edit: Two helpers on the rear, the 15,000 ton train still stalled at the "Curve" ... Then totaling 6 locos head end and 2 on the rear shoving achived 27 mph on the "Curve", and onward to Gallitzin.
No textures yet, but I'm getting tired of seeing the white TransDEM textured mountains (although that white fluffy stuff weather is comming soon to the prototype).
Screenshots and Fraps movies would be lackluster, as the scenery is still bland, for I am still tugging on terrain ... but it is comming along nicely.
Scratchy's route has better detailed looks to it though.
Edit: Two helpers on the rear, the 15,000 ton train still stalled at the "Curve" ... Then totaling 6 locos head end and 2 on the rear shoving achived 27 mph on the "Curve", and onward to Gallitzin.
Last edited: