Follow along with the video below to see how to install our site as a web app on your home screen.
Note: This feature may not be available in some browsers.
Hey guys I have the upper level done and now I am working on finishing the lower level trackwork into the 1st Street Tunnel. I would have made slightly more progress but I'm having an issue (see: http://forums.auran.com/trainz/showthread.php?t=58876) that I am going to try to resolve tonight.
BTW I'm turning 15 tomorrow.
Davis
On the DLS search MB_plate_girder_bridge_4m,girder, or DS Bridge Girder 01 Expandable.
I recommend the MB_plate_girder_bridge_4m im using that one on my LIRR Hempstead Line Route hope this helps.
Cool thank you very much!![]()
Davis
Best piece of work I've ever seen keep going davis.
I have a question can those tunnels a commodate amtrak superliners because I was thinking that you could provide non service from Union station to washington dulles using the same superliners that the state of california operates, with the loco being either An MP36 or PH59I and use a cab car superliner facing north for the most part when heading into washington.
![]()
Davis
![]()
Davis