PRR Screenshots

I got back into my Horseshoe Curve route today, from a long hiatus ... and put in a CNR Signal bridge where the coal and water transfer bridge once was on the east side of the "curve"

Of course I installed BNSF50 Invisatrack in a never ending dogbone loop track, where the MonkeyWrenchModels Drivable Signalman push's Shortline2 Ore Mine Cars out onto the transfer bridge to dump coal into steam loco tenders below on the mainline. Got them up to 43mph without derailing ... lol

PRR%20M.E.825B%20800dpi%20800x.jpg


PRR%20M.E.60C%20Horseshoe%20Curve%20800x.jpg


dcc34f770831559b790aac029bfc7556.jpg


PRR%20M.E.14G%20600dpi%20800x.jpg


PRR%20M.E.15G%20600dpi%20800x.jpg


Have to find a freight station like this one for the Kittanning Point, Glenwhite Coal & Lumber spur

PRR%20M.E.829A%20Horsehoe%20Curve%20800x.jpg


PRR%20M.E.830B%20Horsehoe%20Curve%20800x.jpg


Of course there once was another signal bridge on the west side of the Horseshoe in the semaphore days

I found that the MB Track Pans on the "long straight" were what was cutting my framerates in half ... That would be really neat if K&L steam locos had a smoking effect when the tender water scoops were lowered

Scweenshots will follow ... someday
 
Last edited:
evilcrow,

These screenshots you are taking absolutely astonishes me, I'm surprised as to why more people aren't giving these more attention.


Josh
 
Ken .... Please stop posting Photoshop HO layout .:hehe:

Man ...... your last two had me in aah. Fantastic .. That word just seems to lack the beauty of them ..

Matt
 
Re post #1038

Many thanks Matt for the compliment but the real praise should go to lego207 http://smworks.weebly.com/modules.html for the winter route and to dinorius_redundicus for most of the
snow clad buildings. Try the route out, as the snow textures are very well done, add or delete buildings to suit.

Cheers Ken
 
Back
Top