Suggestions for Jointed Rail (Not Locomotives)

I'm sure this has been drawn up pages back, but 30,000 gallon ethanol tankers.

Aside from being almost everywhere, a good detailed set would fill huge voids on my FEC routes.

I will be happy to help get good shots on the FEC around Fort Lauderdale if need be to get the ball rolling.
 
Well, as long as we're talking tankers, I wouldn't mind if an updated set of
33.5K gallon and 33.9K gallon LPG and Anhydrous Ammonia cars could be fabricated in the future.
You will pretty much find these cars in any mixed freight consist anywhere in North America.
 
Yeah, John, something like that.

It is a great looking tank car and will fit right in for someone modeling the 60's to the 80's.
But I'm going to be a little bit greedy and suggest something newer with the Type E or Type F double shelf couplers and long walkway at the access port.

Thank you.
 
s-l1600.jpg

s-l1600.jpg

45310wl.jpg

45372w.jpg

45384wl.jpg

45327wl.jpg
 
delete.......................................................................................................
 
Last edited:
If you have any issues you can always contact us and we will attempt to help you with whatever your issue is as long as you are using a supported version of Trainz for our products. I dont know who you are or what your situation is so i cant comment specifics but we offer more than fair support for our products and we will go out of our way to assist if its something we can actually assist on.

Our site clearly states all content is for TS12 Build 61388 on up at this time. This forum spot is not for these concerns so if you have continued comments or concerns feel free to email us or open a support ticket.
 
Would it be possible to add an adjustable time for loading cars to the multi industry? In real life it can take 7-15 minutes to load a grain car, in Trainz its like 2 seconds? Not very realistic and takes away from the atmosphere.
 
That would be cool, I second that. You could also have 24/7 sessions that rely on AI trains delivering new cars, sorting them, and then when the new cars are sorted you wait for the industries to be done with the cars. Then you switch them, a train comes to pick them up, then it starts over again.
 
Back
Top