Northeast Corridor Newport News, VA to Boston-South Station, MA (1024x 768 pixels)

Thanks! Took me about a week to get that far, those pictures are old now and I lot has been done since then, but I still haven't even been able to get out of Manhattan yet because there is just so much stuff to move around, and make sure looks correct, and since it is really underground, and not just a hole with a roof put over it, makes it that much harder, but that much better when done. What she looks like from above:
gandalf0444_20120129_0001.jpg

gandalf0444_20120129_0000.jpg

gandalf0444_20120129_0001-1.jpg


Hells Gate:
gandalf0444_20120331_0017.jpg



Gandalf, how did you remove the surface of the baseboard to do track work underground?
 
he had to quote it to show what hes talking about so its all right there a little grid button at the top of the trainz screen click it and the grid will be gone
 
Its easy. You lay the tracks in the ground at standard height, so you place them corectly and later you only need to give they a lower heigh, or you cant lower them and just add walls and roof to cover they
 
Gandalf, how did you remove the surface of the baseboard to do track work underground?
The process I used was using dig holes, then I laid the track as I normally would, except after each segment laid I would lower them below the surface to the needed height, then use wall/floor/ceiling splines to enclose the area around the tracks. Obviously the roof would be last to go in after all the 3rd rails etc otherwise you would be doing it blind.
 
Back
Top