He may add sections like those later on. Right now he is working on finishing the main NEC.
Yes,
that I understand. I'm just curious if those sections are on his to-do list. The line from New York Penn to Greenwich looks amazing. As for the missing junction notice I got while testing, I'm passing that off as a sim engine bug because I dragged a consist through in Surveyor and found nothing to indicate a problem.
On another note, the area around 30th Street Station could use a little sprucing up especially at the SEPTA parts. The merge with the NEC to Trenton in real life contains more underpasses (see Google Maps) than the recreation currently does, and there is a lot of missing catenary. Plus the SEPTA platforms are way too short for the standard 5-to-6-car consist - they barely fit three as it stands.
Finally, you asked me recently if there is a New Haven style catenary you could use. Try this list:
NH Cat 4t,<kuid:106916:10371>
NH Cat Bridge 6t spline,<kuid:106916:10372>
NH Cat 4t wire only,<kuid:106916:10373>
NH Cat transmission wire only,<kuid:106916:10374>
NH 1T Cat Extension Ear,<kuid:520526:1104>
NH Cat 2t V29,<kuid:520526:1702>
NH Cat 2t Wire Only V29,<kuid:520526:1703>
NH Cat 1t Wire Only V29,<kuid:520526:1704>
NH Cat Glenbrook 4t,<kuid:520526:1717>
NH Cat Glenbrook 4t Mod,<kuid:520526:1718>
NH Cat Glenbrook 4T Wire Only,<kuid:520526:1719>