I,m working on another project, producing a timetable for a signalling simulation and waiting for Jib to fix a few Industries in Montana Rail Link 2.8 Maybe I ought to host a session although I,m on a crap shift until next wednesday. It,s a great route and an even greater session but like Jib said we have a shortage of crews and we really need quite a few for the session to reach it,s full potential. I would say we need a bare minimum of 5 people in the session. About 10 is what it needs to work properly and any more than 10 would be a bonus. Anyway I had better stop gassing and come to the point of this post. I have remembered three industries that need working on. Conco Auto Plant has a ratio of 1 car produced for each unit of products consumed which is way to low. If you think about it an autorack carries a lot more cars than, say a coil car so the ratio should be about 5 to one in favor of the cars. Of course even that may need adjusting but I feel thats about right for now. Actually I,m trying to remember how many cars an Autorack can carry but the ratio should reflect the amount a Coil Car (and the other inputs) can carry compared to an Autorack. Which reminds me, when you are reversing toto the sidings the cars derail before they hit the stops. I have no idea why. Smeed & Sons in Billings is not consuming enough scrap I,m thinking the amount of Steel Coils at the start should be 50 and not 250 as no scrap is consumed anyway. The amount of scrap consumed is too low. I,m still trying to work out the amount, in tonnes, in my own session for this typical commodity but I,m thinking maybe between 5-10 tonnes a minute rather than one. Again, it will probably need to be adjusted. Daves Skid Loader needs fixing. There is no queue for the Diesel Fuel which screws it up basically. Had a look at Ikea Lumber Supply in Billings. The ratio is correct but there is no start amount for each. Maybe you coul have a start amount of, say 50 max for each with the max amount set at 250 each, which I think it is now.