Montana Rail Link 1.5 session details

I am interested in trying this out and was wondering if you'd accept a newb? I've just upgraded to a proper Auran/N3V version of T12 (previous used the Steam version). I haven't tried to get in to your sessions yet as I wanted to check first. Thanks,

Kind regards,
Dave
 
I am interested in trying this out and was wondering if you'd accept a newb? I've just upgraded to a proper Auran/N3V version of T12 (previous used the Steam version). I haven't tried to get in to your sessions yet as I wanted to check first. Thanks,

Kind regards,
Dave

Never mind 2.0 is not ready carry on.
 
Last edited:
Never mind 2.0 is not ready carry on.

We have been having some really nice weather these past few days in my part of the woods at least. And I have been taking full advantage of it doing yard work that has needed to be done. Er...I mean lawn work as I dont have a yard per-say. Also my hours at my normal job have increased as well as I am now in a different department. This means very little time is available for me to work on MRL V2.
What free time I do have is spent working on a small pile of locomotives that have cluttered up my work bench. I still have a C&O Allegheny that is in need of a few parts that should be here by tomorrow. I know have an NKP Berk that is in need of a light re-wire. And a few of my HO locomotives need some TLC for this weekend.
And this is the last weekend that the museum will be open for the 2011-12 season. We reopen in the fall for out 2012-13 season. This means that I have been a bit swamped.
BUT the good news is this, after the museum closes up I will be much more inclined to play Trainz again. With running trains there when I come home I get a little trained out. And all the O scale stuff wont be rushed any more. I can relax on working on that as it wont need to be done by Friday like almost every thing is.
MRL2.0 is still being tweaked here and there. I'm not quite happy with it just yet. I keep saying next week, but then I push it back because Im just not happy with it yet. I want to get as much done in it before I ship it out to you guys. I want you all to have the best possible experience on this route and in MP and in any other sessions that pop up. I dont want to rush it, but at the same time I dont want to drag it on.
But remember, I am also working on two other routes. My own freelance route, Fox Mountain RR. And a large part of the CN Flint sub from Port Huron MI to Lansing MI. And I will make both routes have MP sessions. The CN sub looks to be about 100+miles of track with a few large yards and plenty of switching. But that is still MONTHS off form even being able to run some thing on it.

But that sums up that bit of an update. I wont be able to make this sessions this Friday as I will be out to dinner with the owner of the Museum, if he takes us all out to dinner like he has in the past.
 
I'm sorry to hear about the delay with v2 but I do understand. I know I don't want you to "Bill Gates" the next version, i.e. release a product that you know is not ready for the masses just to get it out there...

With that, I will put a server up tonight (Starting around 5pm) for anyone who wants to test the loading of the route and work out any problems they might have before Friday (Tomorrow). I will NOT be around untill after 9PM due to another commitment but the server will be up (hopefully) with some players untill I get back.
Use the TeamSpeak Channel for help tonight.
 
Last edited:
ok since there is not going to be a server up tonight im going to host a mojave server for a few hours
the server name is going to be Across the mojave sub N5vav

the Password is: TrainzPass12
And yes the letters are capitalized.
 
Last edited:
Lets warm up those diesels and start firing those steamers because tomorrow its time to get those shipments out asap. Shipping starts at of course Eastern Time 6:00p.m Hosted by yours truely Beattie.
 
Great fun tonight. Had a pretty good group, can't wait until we do it again. Map is the right size, loads in 3:20 for me and great frame rates.
 
Thank Mouse84,glad it was still up this morning. It will be a better route once we get the cars spread out,and i stay connected.
Got a shorter session of this route but Jib228 wont let me upload it with a lot more INDs,stations that load. A coal mine at logan where the yard was and is the end of the line west.
Only about 150 miles from end to end. All INDs will be ProtoLars to make for a more realisticic operation.
 
Back
Top