I am just wondering if anyone knows how to change what commodities are available for PL tracks. I am of course talking about in the config or other file by the way, not in surveyor. The reason that I ask is that I would like to modify the PL Cement to also be able to load palleted bags of cement.

I would just use a multiple industry but for some reason they lost the ability to be raised and lowered when I wasn't looking.:o
 
Jade --

"I would just use a multiple industry but for some reason they lost the ability to be raised and lowered ... ."

As far as I can recall the built-in MIN could never be raised or lowered, at least not in TRS2004.

There are some on the Download Station by "bekaember" that are height adjustable. Search for "Multi Ind str". They come in a variety of sizes and languages.

Phil
 