i've moved my route to TANE from trainz 2012 and having major problems with tunnels.
certain djb old tunnels present as red and green blocks of colour, when i delete the tunnels i'm left with digholes which I cannot delete , no way i can find anything to select to delete them .
if i drop new tunnels in three the old ones were i still have the original digholes there and its almost impossible to cover them up. anyone having the same issue and if so ,has anyone got a fix , short of going back to trainz 2012 route, removing all tunnels in that version and then exporting the new cdp to tane ?
certain djb old tunnels present as red and green blocks of colour, when i delete the tunnels i'm left with digholes which I cannot delete , no way i can find anything to select to delete them .
if i drop new tunnels in three the old ones were i still have the original digholes there and its almost impossible to cover them up. anyone having the same issue and if so ,has anyone got a fix , short of going back to trainz 2012 route, removing all tunnels in that version and then exporting the new cdp to tane ?