Follow along with the video below to see how to install our site as a web app on your home screen.
Note: This feature may not be available in some browsers.
G'day everyone, just a couple of progress between Ettamogah and Albury. Lots of roads laid, dams sunk, houses placed and trees planted. A few bridges and level crossings and not even into the centre of Albury yet.
Piccy's removed
Hopefully the route will look good and play well when its complete, but thats a long way off yet
cheers,
Graeme
That would be great, thanks Mick. Everything I've done on the hub so far has been off google earth.I best be getting out to Ettamogah Rail Hub and taking sum pic's to build the sheds they have there Greame, I did reseal the road's out there year's ago but did not take any pic's if your going to make this area i'll try and build the shed's for it.
Cheers Mick.![]()
Thanks for that info Mick, I'll see what I can sort out.Looking good Greame there is a large mound of dirt beside the shed on the paper mill side mate it kind of runs all the way down beside the shed apart from a couple of access road's for vehicle's to gain access to the concrete pad's. It is kind of like a two tiered kind of thing
Cheers Mick.![]()
Here is my first screenshot from TS2010:
An S Set sits in the turnback platform at Lindfield after operating a service from Blacktown.
Also, does anyone know how to add a number to the target plate? I can not see any option to do so.
The train came from here.
IIRC you add a 6 car number and the last 2 digits then become the set number - same system i used on a lot of my stock
psycho_aussie; Still needs some more work said:Thank you Psycho; just what is needed for NCL project. Any chance to mod the 2800s to a 4000? I got drawings I can email you.
Thanks
M.G