hi,
most of the time my A1's behave themselves
currently i'm doing a 66km branch line with one crossing loop
the A1 will go to the trackmark on the crossing side
but won't recognize the trackmark on the main side
the loop is signalled correctly it baffles me because they wiil drive to all other trackmarks
any ideas would be greatful
cheers,
patchy
most of the time my A1's behave themselves
currently i'm doing a 66km branch line with one crossing loop
the A1 will go to the trackmark on the crossing side
but won't recognize the trackmark on the main side
the loop is signalled correctly it baffles me because they wiil drive to all other trackmarks
any ideas would be greatful
cheers,
patchy