Gileston
An update on my almost finished one board route
Overall view of the board. I have changed the colour of the canal to something more suitable and the scenery is generally complete. The terminus is in the top right hand corner, goods yard in the top left. The white area lower left is a cement production works. In the middle of the board is a Black 5 with a rake of 6 coaches which will wind its way in a clockwise circle and disappear into the portal inside the tunnel beneath the farm on the right
Fowler 4F moving through the level crossing towards the terminus
...passing through the station approaches
....just arriving at platform 1
....and running around its train
At the cement works Fowler 3f Jinty is busy shunting
An update on my almost finished one board route
Overall view of the board. I have changed the colour of the canal to something more suitable and the scenery is generally complete. The terminus is in the top right hand corner, goods yard in the top left. The white area lower left is a cement production works. In the middle of the board is a Black 5 with a rake of 6 coaches which will wind its way in a clockwise circle and disappear into the portal inside the tunnel beneath the farm on the right

Fowler 4F moving through the level crossing towards the terminus

...passing through the station approaches

....just arriving at platform 1

....and running around its train

At the cement works Fowler 3f Jinty is busy shunting
