Trainz Plus & TRS22 SP5 HF Early Access

Status
Not open for further replies.

n3v_laurence

Moderator
Hello Everyone,

The latest SP5 Hotfixes can now be found on Trainz Plus Beta and TRS22 Beta streams for both Trainz Plus and TRS22 Retail builds.

These builds includes the fix for the Extended Database Repair (trackside object issue) and regular Database Repair (newly cloned routes).

Change log (128486 to 129343)
  • [Fix] Database Repair marking newly cloned routes to unknown location
  • [Fix] Extended Database Repair asset corruption

INSTALLING & PATCHING:

Trainz Store Only:
For Trainz Plus via the Trainz Plus Beta Stream

PC: Requires Trainz Plus Beta 129139 (PC). This is a small patch 10 MiB for build 129343
PC: Requires Trainz Plus 128486 (PC). This is a small patch 18 MiB for build 129343
PC: Requires Trainz Plus 126280 (PC). This is a large patch 12.9 GiB for build 129343

Mac: Requires Trainz Plus 128490 (Mac). This is a small patch 19 MiB for build 129393
Mac: Requires Trainz Plus 126293 (Mac). This is a large patch 12.9 GiB for build 129393

For TRS22 Retail via the TRS22 Beta Stream

PC: Requires TRS22 128487 (PC). This is a small patch 9 MiB for build 129335
PC: Requires TRS22 126273 (PC). This is a large patch 12.9 GiB for build 129335

Mac: Requires TRS22 128485 (Mac). This is a small patch 19 MiB for build 129339
Mac: Requires TRS22 126286 (Mac). This is a large patch 12.9 GiB for build 129339

Please use https://n3vgames.typeform.com/to/xRdryu to report any bugs.
 
Last edited:
1 minute to install on retail version.

No problems detected. Everything works fine! No problems placing track objects
Good job team!
 
The precaching phase is still running. This started around midnight and the log became stuffed and is no longer displaying messages at 0815 this morning.
 
The precaching phase is still running. This started around midnight and the log became stuffed and is no longer displaying messages at 0815 this morning.
Yup. The client refresh completed quickly on my beta build (129139) upgrade, but the Trainz Plus 128486 (PC) to build 129343 patch resulted in a VERY lengthy, Full DBR/ Client Refresh. Seemed to be longer than a 'normal' EDBR in fact. As it was 'silent and in the background' many users would be oblivious that it was being carried out.
It is my standard practice now to observe these silent client refreshes by using the 'Show client logs' utility window following any patch application until all activity ceases and it displays the message 'Client refresh complete'.
 
Last edited:
Yup. The client refresh completed quickly on my beta build (129139) upgrade, but the Trainz Plus 128486 (PC) to build 129343 patch resulted in a VERY lengthy, Full DBR/ Client Refresh. Seemed to be longer than a 'normal' EDBR in fact. As it was 'silent and in the background' many users would be oblivious that it was being carried out.
It is my standard practice now to observe these silent client refreshes by using the 'Show client logs' utility window following any patch application until all activity ceases and it displays the message 'Client refresh complete'.
It's still crunching away. I have other things to do and I'm letting the EDBR/Refresh run away as it needs to unbothered.
 
Have the texture blurs not been resolved yet?

iMac Retina 5K 27-inch
3,6 GHz Intel Core i9 8 core
Radeon Pro Vega 48 8GB
64 GB 2667 MHz DDR4
Sequoia 15.3.2
 
Status
Not open for further replies.
Back
Top