For your entertainment, operations on the 'Aussie C&O', TRS23+, v117669 will be posted to this thread daily where possible.
But first, a brief description of the layout. (Currently there are no ‘Faulty ‘ or ‘Missing’ dependencies shown in ‘Content Manager’.
Design is 'Portal to Portal' with mostly dual track. 5 Portals serve a 'Fiddle Yard'. Round trip durations are between ~15 min. and ~1 Hour. There is no clocked schedule. Load/Unloading is governed by resource levels at animated Industries.
Animated industries are an Oilfield serving a Refinery serving a Coal Mine serving 2 separate Power Stations, one of which supplies power to the Coal Mine. There is also an animated Container Terminal and two animated Goods Depots. There are 10 trains active on the layout, serving 6 major industries and 1 major passenger station although some maybe held on Triggers in the ‘Fiddle Yard’ or at Industries etc.
But first, a brief description of the layout. (Currently there are no ‘Faulty ‘ or ‘Missing’ dependencies shown in ‘Content Manager’.
Design is 'Portal to Portal' with mostly dual track. 5 Portals serve a 'Fiddle Yard'. Round trip durations are between ~15 min. and ~1 Hour. There is no clocked schedule. Load/Unloading is governed by resource levels at animated Industries.
Animated industries are an Oilfield serving a Refinery serving a Coal Mine serving 2 separate Power Stations, one of which supplies power to the Coal Mine. There is also an animated Container Terminal and two animated Goods Depots. There are 10 trains active on the layout, serving 6 major industries and 1 major passenger station although some maybe held on Triggers in the ‘Fiddle Yard’ or at Industries etc.