Follow along with the video below to see how to install our site as a web app on your home screen.
Note: This feature may not be available in some browsers.
That would be awesome! we are currently up at Mount Union on the route and are working on making the route more accurate heading back towards Rockhill. Details are also actively being added to the EBT in these areas as well. There is definitely a severe lack of assets out there for the EBT, especially good ones. Several years ago Jointed Rail made (today decent) coal hoppers, the mikados are "revamped" versions of the old trs2004 Ben Neal mikados. Let's just say that there may or may not be some key structures, for Mount Union in particular, coming soon. We have previously commissioned new EBT Mikados, however it seems like there hasn't been like any progress made on them within the past couple of months beginning to feel like the guy really doesn't want to make them at all. I hope that we are wrong about that, however we may be looking for someone else here soon. It's going to be expensive either way we go. Help on some areas of the route may be of interest to us, however. I will send a pm if we come across anything that we don't really know what to put in it's location.Lots of progress and great work. Really impressive what you've accomplished in so little time. I don't say that lightly either. I've modeled the EBT's whole main line and branches using my own DEMs and the EBT's 1919 ICC track diagrams for the most part. My own preference for era to model is the1920's and 30's. Probably mid 1920's was the EBT's best period for traffic imo. I see I'll have to start checking back in more frequentlyto see how you're making out
I've been away from trainz for - I don't know maybe2 years now. Real life can be demanding and painful. It's good to see another group pick this gem of a route to model. Most of my route lacked scenery but the terrain was good and track grades and curves were all accurate. I loved running the trains over it.
It's discouraging to see the available models get further out of date with every new trainz update. We never had models of no 12 and the 14 class (also sg 0-6-0's no 3 and no 6) so if any of them are in the works that's great. Personally, I'd like to see prairie no 11 included for my own time frame though it's not useful for1940 and up.
Your route looks fantastic in the videos to date. A great start. But you are right, there are a large number of unique structures that still have to be modeled.
My preference on using 3 rail dual gauge track in Mt Union is to use it. I included it on my personal version. It's a visually important and integral part of the operation in Mt Union. Yes clearly it's operationally challenging and I think there are still significant problems with it. I always thought it would be possible to use scripting and/or signaling to make it all work but I don't think it's been done yet..
I'm a life member of FEBT and over the years I have collected a lot of reference material on the EBT plus some on the PRR in Mt Union and the McKelvey Bothers 3'ng logging rr south of Rockhill (though that's gone by late 1920's). If you're interested, I might be able to help with info or details on specific areas on the EBT.
RPearson