Hello Marsz-lings
Hi Ish, My “M” unit train (I think that what I’m going to call the “orange” train) is just the beginning. I plan the make to make all of the assets a railroad on Marsz would need to do all it needs to do. What I’m thinking my plan is, is to start down loading my content with other road names like Trans-Alliance or what ever you all want. (Not rebel). There’s car maintenance, track maintenance. I’m also working on track laying machines. A very large sting of tracked vehicles for that. I want to move a tunnel boring machine 100 to 150 from the landing zone. I want a “big hook”. 600 ton train crane and all the cars needed for car recovery. I’m just getting started. I’ve got track, tunnels, switch machines, signals. Much more to come. So to start with Carelton Rapids well be a asset provider in prep for landing at Midway Station. As you can see, Marsz is getting big in the window. Not long now. Don49plm singing off.