Keep up the fantastic work! I'm really enjoying watching this thread!
Thanks! Glad you're enjoying it!
Work is slowly moving along again. I've gotten a bit more work done with the lumber mill, still not close to completion but at least it's moving along. I've also successfully installed a paper mill next to the Autumnville West Yard. Due to the mill lying on the CSX portion of the trackage, it's CSX's switching territory, however it is not uncommon to see an A&SE unit doing their work for them. I've also finished expanding the West Yard. It still has the same meager 5 tracks, but the tracks are now longer and capable of holding small trains. I've started adding a bit of scenery in the area, not a whole lot but it's a good start, got a McDonald's among other things. Also slowly getting touch up work done in Autumnville, replacing missing textures, etc. I've almost finished putting the A&SE shops back into full operating order, just got a bit more ballast and weeds to add, and also I have to fix a shop. I am missing the track asset for the JR 7 stall shop, <kuid2:45324:38199:1>. I would appreciate it if someone could point me towards where I can download it (bearing in mind that I've already scoured the JR website and thus far found nothing).
Anyways, on to toady's shots. The morning local, L219, is working in a slight drizzle on the dilapidated tracks of the small warehouse sandwiched between east and south yards. L219 is not one of the Autumnville locals, although it does do switching in Autumnville. The Autumnville locals are L220 and L221, which run in the morning and evening respectively. L219 works Knudsen Industries, an industrial complex north of Autumnville, then runs south. On some days it switches CSX's paper plant, today being one of them. It then runs to the North Autumnville Milk Processing plant where it does further switching. After that it runs to the Nestle Plant in Autumnville, where some of the loads from the milk plant are dropped off. Then it runs as far south as Oak Grove to switch there, and then crosses over and switches the Brierfield corn silo, before returning to South Yard to switch the warehouse, which is the last stop before the local ties down in the Eastern Class Yard for yard switcher Y125 to sort out later. Today's L219 was run by a lone SW1500, 1652.



As L219 switches out the loads in the warehouse, southbound tank train T334 rolls into Autumnville and approaches the South Yard, where it will stop, change crews, and layover until it has clearance to proceed later today. The tanks train is powered by B40-8W's 420 and 428 with SD29T-3 2507 trailing.

The trains meet, and T334 rolls on to park itself, while L219 finishes its switching duties for the day.



That's all for today, hope you enjoy the shots!