Steamshots USA..Lets See Some Steam Shots..

1962f4098d775bdc397a209e9fee39a1.jpg


2e2237d3f60db4c5485ac76302420206.jpg
 
Thanks Norm. It is <kuid2:439337:101189:2> Stockyard_Hogs. Ever since autumn started I've been thinking of Christmas ham :udrool: .

Dave
 
Last edited:
In 1934, the Pioneer & Avalon had looked into 5 different 4-8-4 designs. The Southern Pacific's GS2, GS4, and GS5 Classes, Western Maryland J1 Potomacs, Norfolk and Western J Class, Reading T1's, and the Milwaukee Road S2 Class.

In 1935, they ordered 15 N&W J Class Northerns from the N&W's own Roanoke Shops and the about 50 Reading T1's to be modified for heavy fast freight over the 1.7% on the P&A's line between Pioneer, IL, and Avalon, GA. The speed limit was 75 which meant trains could get a running start before hitting the grade.

By the end of 1935, the first P&A D1a (T1) and the first D1b (J) had arrived in Pioneer for a break in run. In 1939, all of the D1 class northerns had been delivered to the railroad and had been serving the P&A well.

On April 28th, 1940, 2 early D1a's had been rebuilt and were being tested with 3 P&A coaches and about 180 empty coal hoppers, equivalent to 70 loaded cars, down a part of the line between Hendersonville, TN, and Bloomington, IN. The D1a's also had new AUX cars due to there not being a waterstop for them on this leg of the test. A railfan catches the train waiting for a P&A Express service, lead by P&A D1b #503, "The Pioneer's Axe" as it speeds by at 40 MPH (tight curves at the start of the downhill in Hendersonville).

Doubleheader waiting...
e5ec5f1da3db1f412cc1fd603b4b965d.png

#503 passing...
df1a0001aae79981567efbd18f8192de.png

"The Pioneer's Axe" passing...
61854328a8e7d47ac4606afe3fc6c6e8.png

The Doubleheader receiving the green...
14d1908260b369416da22db3443ddcc4.png

End of the train...
b0976f3d1d90786765946659fe2e3cf4.png

58d45026589a89a35a366c71d8fa704b.png


BONUS:

Here are the 3 cars put behind the 2 engines
P&A Pullman 10-1-2 Sleeper "The Axe"
P&A Pullman 14BR Sleeper "Limitless"
P&A Divided Coach
8ec2023e6bfad393b6874586c18205b0.png


NOTE: This is a work in progress route, I will NOT and I repeat, I will NOT, give out the reskins. These are private reskins made my by me. The track is also a reskin by me and will not be given out.
 
My-Trainz-Screenshot-Image.jpg
the afternoon silence has been shattered by the thunderous rumbling and whistle blowing of this P-4 Pacific powered freight train as it rounds the curve with a string of loaded freight cars trailing.
 
It appears the newsreels being shown in the theaters are true, the US may be going to war. Today on a cool autumn day the normally noisy platform grew quite as not one, but two odd trains came by.

The Southern was carrying a consist of newly reconditioned boxcars into troop sleepers and kitchen cars. You'll notice the windows are opaque so as not to let enemy spies report troop numbers.

d808475792ee887cb515a49a90d14f4d.jpg

08294ff87864560ad295fc52e850afc6.jpg


Then across from the terminal on the station bypass the L&A with a new 9 inch railgun.

0acb80623643ec49d2281280c428b8c3.jpg


b6b1dfe47c74e1be6d3c7395b080bd95.jpg


4fa0de33353f1f7925fddca30e75fce6.jpg


1a9a8494c69e9eec6167afb88cde3883.jpg


Dave
 
For those who haven't noticed yet,





RMM has uploaded to the DLS some new dead trees. I'm still sorting out how to best utilize them. :D
 
Sometime in the 2020s the US decided to revive the American Freedom Train and chosen the recently overhauled Union Pacific 3985 to pull it in the Southwest region of the states, but unfortunately severe flooding has damaged the UP tracks, so the committee made an agreement with the Burlington Northern to run the AFT on parts of the Clovis subdivision.

My-Trainz-Screenshot-Image.jpg


My-Trainz-Screenshot-Image.jpg


My-Trainz-Screenshot-Image.jpg


My-Trainz-Screenshot-Image.jpg


My-Trainz-Screenshot-Image.jpg


My-Trainz-Screenshot-Image.jpg


My-Trainz-Screenshot-Image.jpg


My-Trainz-Screenshot-Image.jpg


My-Trainz-Screenshot-Image.jpg


My-Trainz-Screenshot-Image.jpg
 
P&A #508 speeds by a N&W A Class slowing down for a red as they get near the end of the RIP track. #508 recently was overhauled and since the switcher had stretched out the front coupler, it is stuck in this position until it reaches Pioneer for repairs.
4lVnfvE.jpg
 
Back
Top