poppins122325
TC1/TC2/TRS 09,06,04/UTC
hi all
is there a guide or someone that can help me withe the qr signals built in 06 and 09 i want to get a section of track bi directional is it even possible with these signals
heres a rough diagram of what i want
----------------------------> passenger
<---------------------------- passenger
<---------------------------- freight dwn
<----------\------------------ freight dwn
>-----------\------\-----------> freight up
> ------------------\--------\--> freight up
..........................................\-------siding
i need the train the has had the loco run around in the siding to cross the 2 up lines to go onto the down line
sorry for the crapy diagram
Thanks
Nathan
is there a guide or someone that can help me withe the qr signals built in 06 and 09 i want to get a section of track bi directional is it even possible with these signals
heres a rough diagram of what i want
----------------------------> passenger
<---------------------------- passenger
<---------------------------- freight dwn
<----------\------------------ freight dwn
>-----------\------\-----------> freight up
> ------------------\--------\--> freight up
..........................................\-------siding
i need the train the has had the loco run around in the siding to cross the 2 up lines to go onto the down line
sorry for the crapy diagram
Thanks
Nathan