Hi there. I have from ProTrainz; the Pennsylvania Railroad GG1 (DGLE, Tuscan and Tuscan 2), the MP54 MU cars (trailers as well), GP9 (early and late), Trainmaster, F7A DGLE (and Tuscan Red) F7B DGLE (and Tuscan Red), the EF15s, AF15s, DS-4-10, K4s, M1, DD1, N5C caboose and N5 Caboose. Well, can anyone give me an idea of a session on the NEC route from Philadelphia to Wilmington using all these locomotives plus freight cars for the freight trains, and how long to space MP54 runs between the GG1s with the PRR baggage, express and P70 coaches and the frequently entering and leaving freight trains? Thanks.