I've been tinkering around with the Electric commuter route, i have merged it witht he queensland route and then built my own addition to that which goes thru a inner suburb and out to the Airport, Most of the line is now approved for 160kmh running making the trip from tenneriffe to banks heath 5 - 10 minutes! trains have been timed for a 20 minute Frequincy with a 10 Frequincy between Banks Heath and Teneriffe with the addition of a shuttle service, Here are some before and after shots of the Electric Commuter Section
This was the yard in Teneriffe and now is the 7 Platform station
The next station is Warradale
Brightwater
Tinoats (The gravel road i had added prior)
Hammond was a interesting one. It was to close to Tinoats to make it a suitable station so i Closed it and moved Hammond about 500M down the track
the New Station For Hammond, this Station Allows "terminators"
Having 160km running saw the line take a whole new route thru the hills between Hammond and Sutton Bridge,
Banks Heath (also allows terminators from Teneriffe)

This was the yard in Teneriffe and now is the 7 Platform station

The next station is Warradale

Brightwater

Tinoats (The gravel road i had added prior)

Hammond was a interesting one. It was to close to Tinoats to make it a suitable station so i Closed it and moved Hammond about 500M down the track

the New Station For Hammond, this Station Allows "terminators"

Having 160km running saw the line take a whole new route thru the hills between Hammond and Sutton Bridge,

Banks Heath (also allows terminators from Teneriffe)