Hello. I am building a timetable up for my route and would like to compress a days operation into 2 hours or so (the route is a rural line, so not much going on). As I don't have a stopwatch, I was wondering if there is a rule on the DLS that advances the clock forward in time when in Driver mode? Any thoughts?
Best wishes, and thanks
Padster
Best wishes, and thanks
Padster