Progress Report
Originally I started to build this route for my own enjoyment with never a thought about releasing it. As I said in the very first post this route is 30% done. Here is what is done:
1) Park Hill Slag Dump 100% complete
2) Scrap Yard 100% complete
3) Wheel Plant (railroad wheels) 100% complete
4) Blast Furnaces E,F,G,H,L&K 100% complete
5) Open Heath Furnaces 90% complete
6) Primary Mills 100% complete
7) Coke Ovens 2 Plants 90% complete
8) Coke Oven Bi-Product 2 Plants 90% complete
9) Sintering Plant 100% complete
10) Ladle Car Maintence 50% complete
11) Refactory Brick Works 100% complete
12) Gautier Rolling Mills 100% complete
13) Railroad Car Fabrication Facility Franklin 50% complete
14) Lower Works Rolling Mills 50% complete
15) Lower Works Railroad Axel Plant 50% complete
16) Lower Works Machine Shops 50% complete
17) Airco Oxygen Plant 100% complete
18) Comemaugh & Blacklick RR Maintence Shops 50% complete
19) Wire Mill 50% complete
20) City of Johnstown 30% complete
Stuff that needs done
1) Complete the PRR mainline.
2) Complete B&O branchline
3) The Shell Plant (present an addition railroad car fab)
4) Add coal mines not sure which yet there are choices in every direction
5) Add portals and AI on the mainline
6) Complete Lowerworks ore yards
7) Model Hickston Run Dam and slag dump
8) For the first hundred years of steelmaking iron ore was mined locally maybe a iron ore mine.
9) Lots of other great ideas that I haven't thought of yet.:hehe:
Progress is slow because I am accountant in real life and it is tax season but I still work on the route as much as I can.
The route is one huge session and I haven't yet finished it. For example just to stock the coke ovens, sinter plant all six blast furnaces, and all 12 open hearth furnaces takes over 12 hours maybe more. The good part of that is I converted many of the buildings to night mode which is cool but I am not sure anyone in the community would be interested in a route that takes potentially days to complete except me.:hehe: Other problems are the use of content off the DLS, the need of a high end computer for decent frame rates and the session is mostly slow switching activities. With that said the ultimate goal of this route is to make all the products necessary to build railroad cars which the Johnstown Plant of Bethlehem Steel is famious for.
There is still a lot to do........
More to Come.....:hehe: