ApproachMedium
Youtube dude
Nonsense,
I have a high end computer as well and think these shots are fantastic. I love the detail of the railyard (with the tree in the middle). What kind of track is that? I like the way the clean blends in perfectly with the rusty.
Thanks. I'm not sure which picture you're referring to. I used, and changed track a lot throughout the route. Mind referencing a post number, and I'll let you know the kuid of the track used.
trainzpro said:Why not try implementing DEM terrains and TIGER lines using the HOG utility (if you're familiar with that)? I find it to be a very useful tool for prototypical route building.
I considered that, but I have no clue how to create them and I also wouldn't know what locale to use. Also 90% of the track and base boards have been laid on the route, so it's too late to add any DEM maps anyway.
On future routes I plan on using DEM's exclusivly. I just need to figure out where and how to get them
-Joe