suburbansilvervlogs
Hotbox Content
Up until now, I have had AI controlling more than 2 junctions, like in this photo below:
However, I have recently added directional track marks, and the AI can only control 2 of the junctions. I have checked to make sure the route is possible and it is. This is also happening along other parts of my route. Obviously, the AI is blocked at a red signal as the route is 'unsignalled'. Any thoughts?
However, I have recently added directional track marks, and the AI can only control 2 of the junctions. I have checked to make sure the route is possible and it is. This is also happening along other parts of my route. Obviously, the AI is blocked at a red signal as the route is 'unsignalled'. Any thoughts?