paperpusher
paperpusher
I found two driver commands and have used the HoldJunctiononly very useful for my transit layouts,
Another command is called holdjunctionwithtrackext and I would like to know how to use it in a schedule library <kuid:131986:1089>
It has a Left-left
Right-Right
Left-backward
Right-backward
forward-backward
then one adds a junction ID to it. How is applied in a route/session.
Background: I have transit layouts, buses/streetcars etc. At turns, I use the Holdjunctiononly to instruct the switch to turn the vehicle to the direction for the route without locking the switch by the vehicle as happens with a ControlJuction command. If I have several turns/switches I use serveral Holdjunctiononly in sequence.
Note: For most of my layouts, I have to things in reverse, as tracks/trolleybus catenaries are left side driven and have to instruct commands in a reverse instruction (to go left, instruct switch to go right.
Another command is called holdjunctionwithtrackext and I would like to know how to use it in a schedule library <kuid:131986:1089>
It has a Left-left
Right-Right
Left-backward
Right-backward
forward-backward
then one adds a junction ID to it. How is applied in a route/session.
Background: I have transit layouts, buses/streetcars etc. At turns, I use the Holdjunctiononly to instruct the switch to turn the vehicle to the direction for the route without locking the switch by the vehicle as happens with a ControlJuction command. If I have several turns/switches I use serveral Holdjunctiononly in sequence.
Note: For most of my layouts, I have to things in reverse, as tracks/trolleybus catenaries are left side driven and have to instruct commands in a reverse instruction (to go left, instruct switch to go right.