Hi all, am thinking of creating a large UK based yard with storage tracks, a diesel depot, steel warehouse and scrap yard. I want it to be as realistic as possible and want to know are such yards controlled from a signal box with automatic points and signals or manual levers at points and unsignalled?? thanks in advance for your replies and advice.