WC Shotz

I made a Leslie S3L, I am waiting for it to be made into a 3 part, sometime tonight, it will be a 3 part echo. For now, it is just a 2 part.
 
An early morning Gen-Cor job is seen here working out in the Howard Industrial Park as a light snow begins to fall

 
WC's GenCor job heads north out of Green Bay and past the old CNW RoW and now is the Mountain Bay walking/biking trail....But now its winter and now used for snowmobilers...This line runs all the way west to Wausau





Now entering the Howard Industrial Park

 
Last edited:
LO11 passes the old Milwaukee Road Depot here in Wausau Wisconsin as it makes its way north for Prentice

 
WC local heads to the north side of Wausau to do some morning work before heading out to the west side industrial park

 
The WC as arrived up here in Pembine and has to do its required stop at the stop sign and will proceed once the ELS as come thru and will have some set outs for the ELS


 
2 old ones I dug up of train LO12 at Prentice as its heads east for Bradley and then south for Wausau



 
A light snow falls as train GBSOA lead by a Wisconsin Central SD45 (the Look Listen and Live loco), an F45 and an SDL39 as it makes its way north thru Marinette Wisconsin





 
CN Gencor job heads to the Howard Industrial Park to do todays work




Here we catch him at ELS Jct where the Escanaba and Lake Superior RR comes off there line and onto the CN line





 
Train 17 gets on its way and makes its way for Wausau as it leaves Stevens Point and crosses the Wisconsin River




Slowing to hop onto the Valley Sub here at Junction City






Train 17 makes it was thru the small town of Knowlton




Coming thru Mosinee




Passing the Weston III Power Plant




Slowing to enter the Wausau Yard Limits




Entering the yard here at Wausau




Pulling up to the yard office to end this run for the day



 
Nice shots! I am eager to get back to running trains on the sim and on this route! I worked for a few hours last night in doing stuff in Rhinelander and I am not too far away from completing Bradley to Rhinelander. The only part I have left is putting in neighborhoods, streets, etc west of the mill and to the southeast of the mill across the Wisconsin River. Everything from Bradley up to Highway 47 has been completed. East of there is where I need to finish up!
 
Back
Top