Hi all
Here is the schematic for the route of the challenge:
SOUTH-WEST......................................................................................NORTH
TM--TM--TM--TM--TM--TM--TM-\
............................\
------Portal.Basic-----------\....................................../---TM--TM--TM--TM--TM--TM--TM---
..............................\.........../--Platform2--\........../
------Portal-------------------\---\-/---/---------------\......../-----Portal.Basic-----------------
....................................X....................\....../
------Portal-------------------/---/-\---\----Platform.1---\----/-------Portal-----------------------
............................../...........\
------Portal.Basic-----------/.............\-------------------\
............................/........... ...\-Multiple.Industry-\---
TM--TM--TM--TM--TM--TM--TM-/
SOUTH EAST
--TM--TR--TM--TR--TM--TR--------- Separate timing track ----TM--TR--TM--TR--TM--TR-------------
Please read . (periods) as spaces - the forum wont allow me to put in leading spaces
Here is the schedule:
Train1: From: south west, 8:01 arrive platform 1, 8:03 depart north
Train2: From north, 8:01 arrive platform 2, 8:02 depart south west
Train3: From south east, 8:01-8:02 through fast to north
Train4: From south east, 8:06 arrive platform2, 8:07 depart north
Train5: From south east, 8:08 arrive industry, load, run around train, wait until Train8 departed, depart south west
Train6: From south west, 8:09 arrive platform1, loco runs around train, depart to south west as soon as possible after 8:14 provided departure would not delay other train movements
Train7: Fast south east to north due through 8:11, may be up to 5 minutes late, top priority, no other train movements to impede progress
Train8: From north, 8:13 arrive platform 2 (may be up to 2 minutes late), Train7 must already have passed, wait for at least 2 minutes, depart to south west provided no other train movements are delayed
Train9: From north, 8:16 arrival platform 1 (switch to platform 2 if platform 1 not available). Arrival delayed until at least one platform is available. 8:18 depart south west
This schedule is quite complex to implement as there is contention for arrival and departure paths, paths through the diamond crossing and fast line, platforms and allotted time slots.
Major logic that needs to be timetabled includes:
Segy
Here is the schematic for the route of the challenge:
SOUTH-WEST......................................................................................NORTH
TM--TM--TM--TM--TM--TM--TM-\
............................\
------Portal.Basic-----------\....................................../---TM--TM--TM--TM--TM--TM--TM---
..............................\.........../--Platform2--\........../
------Portal-------------------\---\-/---/---------------\......../-----Portal.Basic-----------------
....................................X....................\....../
------Portal-------------------/---/-\---\----Platform.1---\----/-------Portal-----------------------
............................../...........\
------Portal.Basic-----------/.............\-------------------\
............................/........... ...\-Multiple.Industry-\---
TM--TM--TM--TM--TM--TM--TM-/
SOUTH EAST
--TM--TR--TM--TR--TM--TR--------- Separate timing track ----TM--TR--TM--TR--TM--TR-------------
Please read . (periods) as spaces - the forum wont allow me to put in leading spaces
Here is the schedule:
Train1: From: south west, 8:01 arrive platform 1, 8:03 depart north
Train2: From north, 8:01 arrive platform 2, 8:02 depart south west
Train3: From south east, 8:01-8:02 through fast to north
Train4: From south east, 8:06 arrive platform2, 8:07 depart north
Train5: From south east, 8:08 arrive industry, load, run around train, wait until Train8 departed, depart south west
Train6: From south west, 8:09 arrive platform1, loco runs around train, depart to south west as soon as possible after 8:14 provided departure would not delay other train movements
Train7: Fast south east to north due through 8:11, may be up to 5 minutes late, top priority, no other train movements to impede progress
Train8: From north, 8:13 arrive platform 2 (may be up to 2 minutes late), Train7 must already have passed, wait for at least 2 minutes, depart to south west provided no other train movements are delayed
Train9: From north, 8:16 arrival platform 1 (switch to platform 2 if platform 1 not available). Arrival delayed until at least one platform is available. 8:18 depart south west
This schedule is quite complex to implement as there is contention for arrival and departure paths, paths through the diamond crossing and fast line, platforms and allotted time slots.
Major logic that needs to be timetabled includes:
- Is there enough time before the express passes to run round the train?
- Is there a platform free and if so which one?
- Is the required path free yet with at least 2 minute separation?
- Which train should depart first when there is contention for paths?
Segy
Last edited: