Norfolk & Western - Appalachian Coal TANE 002
Ever since I discovered the Narrows Coal Crushing facility in Gawpo50's N&W route it has bugged the heck out of me that it was stuck out on the end of long dead end spur.

I knew the facility actually existed at Narrows, VA but it made no sense. If you were taking a long drag of coal cars from the West to the East and they needed to be crushed you had to go all the way to Radcliffe to get turned around and then take it all the way back to Narrows. And there was nowhere to get turned around at the facility. I knew there had to be another bridge somewhere West of Narrows.

Ah, ha! sure enough there was in fact a bridge just west of the facility

This is the first draft of the bridge. Turns out that the southern bank tracks were double tracked there which I'll have to add and, although I had already extended the sidings at the facility it turns out that there are actually 4 long sidings there but it looks do-able.

http://www.nwhs.org/archivesdb/thumbs/photos/NW07467.jpg and http://www.nwhs.org/archivesdb/thumbs/photos/NW05907.jpg
If you love this route as much as I do this alteration is pretty much mandatory. Have fun!
Edit; Phase 2

It looks like I'll need to lower the river banks and build ramps up to the beginning of the bridge structure. I know I've seen that truss structure in trainz somewhere, I just have to track it down.
Edit2; Ah, a Whipple Truss, thanks Colorado71!

OK, looks like I have all the pieces.
Ever since I discovered the Narrows Coal Crushing facility in Gawpo50's N&W route it has bugged the heck out of me that it was stuck out on the end of long dead end spur.

I knew the facility actually existed at Narrows, VA but it made no sense. If you were taking a long drag of coal cars from the West to the East and they needed to be crushed you had to go all the way to Radcliffe to get turned around and then take it all the way back to Narrows. And there was nowhere to get turned around at the facility. I knew there had to be another bridge somewhere West of Narrows.

Ah, ha! sure enough there was in fact a bridge just west of the facility

This is the first draft of the bridge. Turns out that the southern bank tracks were double tracked there which I'll have to add and, although I had already extended the sidings at the facility it turns out that there are actually 4 long sidings there but it looks do-able.

http://www.nwhs.org/archivesdb/thumbs/photos/NW07467.jpg and http://www.nwhs.org/archivesdb/thumbs/photos/NW05907.jpg
If you love this route as much as I do this alteration is pretty much mandatory. Have fun!
Edit; Phase 2

It looks like I'll need to lower the river banks and build ramps up to the beginning of the bridge structure. I know I've seen that truss structure in trainz somewhere, I just have to track it down.
Edit2; Ah, a Whipple Truss, thanks Colorado71!

OK, looks like I have all the pieces.

Last edited: