595 heads a general freight service out of the yard at Richmond on a cool day.
At it's first stop at Peabody, 595 shunts some wagons into the lumber yard whilst it's train sits on the mainline.
After completing the shunt, 595 powers past a stabled 2802 with a MOW train.
After tackling the steep down hill grades from Peabody, 595 grinds to a stop outside the depot at Parker.
In the shadow of the mountains, 595 propels some empty logging skeletons up the branch to Parker logs.
Nearing the log yard, 595 slows it's train. The transfer caboose will be cut off, and then the log wagons placed into the loading track.
With the log wagons dropped at Parker Logs, 595 drifts back to Parker with the caboose.
After completing shunting, 595 powers away from Parker under the classic road bridge.
Regards
Zec