G Ghost42 Well-known member Mar 25, 2015 #1 I want to make deliveries of gen goods to two industries (AI) what instructions are needed to split the load 50/50? Is there a rule?
I want to make deliveries of gen goods to two industries (AI) what instructions are needed to split the load 50/50? Is there a rule?
M MeowRailroad CKRail Mar 25, 2015 #2 Maybe you could do it with waybills or some other car sorting system?
O oknotsen Holder of a broom Mar 25, 2015 #3 You could consider letting the AI un-couple half the cars at a siding, than go for unload at the industry, re-couple and go to the next industry?
You could consider letting the AI un-couple half the cars at a siding, than go for unload at the industry, re-couple and go to the next industry?
M mikeaust Active member Mar 26, 2015 #5 You could also use the Commodity Picker. Select the red cross for the ones you dont want unloaded, then clear the cross after the first delivery, Cheers, Mike
You could also use the Commodity Picker. Select the red cross for the ones you dont want unloaded, then clear the cross after the first delivery, Cheers, Mike