In working on my update of an old NEC route, I ran into a little problem. Anyone got a solution to the space under my track being filled in by land, as if there was an embankment for each track?
Have you tried using the Terrain Tools to lower the terrain under the bridge. Perhaps use the wireframe view (F9) so you can see what you are doing. Peter
In working on my update of an old NEC route, I ran into a little problem. Anyone got a solution to the space under my track being filled in by land, as if there was an embankment for each track?
I've seen some non-procedural track that does that. I think they are called "terrain" versions which seem to be designed for the ballast areas to try and "stick" to the ground?
You need to see if there are "non-terrain" versions of that track.