WIP in TANE SP2 (still waiting for final HF to be issued before I update)
I use a Bascule lift bridge kuid2:60238:27201:3 by Vulcan on a mainline section of fast track (70 mph) over a river. It is not practical to raise the track and use a normal bridge. The bridge lifts JUST in time for an approaching express. (This is most unrealistic) SO is it possible to alter the trigger radius for the bridge to raise well before the consists approaches?
Many thanks if you can advise a suitable solution.
helian43
I use a Bascule lift bridge kuid2:60238:27201:3 by Vulcan on a mainline section of fast track (70 mph) over a river. It is not practical to raise the track and use a normal bridge. The bridge lifts JUST in time for an approaching express. (This is most unrealistic) SO is it possible to alter the trigger radius for the bridge to raise well before the consists approaches?
Many thanks if you can advise a suitable solution.
helian43