I would like to merge a route I made at a baseboard height of 0m with another route that is at 12.5m at the point where I want to merge. Is it possible to raise the 0m route's baseboards (there's only about 10 of them) to 12.5m, including everything in the route?
Otherwise I think I'm hosed..........
Thanks,
Mick Berg.
Otherwise I think I'm hosed..........
Thanks,
Mick Berg.