Many thanks. In fact, most of the objects I placed into this layout aren't 'italian-style' but my will is to upload the route at DLS with content available all in DLS
Good to see that it will be uploaded to the DLS. Very much looking forward to driving on an Italian route, I've got a fair bit of TrainzItalia rollingstock, so I will be able to drive them on an appropriate route.
Good to see that it will be uploaded to the DLS. Very much looking forward to driving on an Italian route, I've got a fair bit of TrainzItalia rollingstock, so I will be able to drive them on an appropriate route.
Cabview of the tracks - Bologna-Padua Line (in my route layout limited to Abano Terme)
-
Abano Terme Station (11 Km away from Padua)
-
Some houses near Abano station.
Very encouraging comments!
Thanks again.
I am going to release the first version of PADUA/PADUE/PADOVA and - if the things are all rights - in the next few days I will be ready to upload to DLS the route.
In the meantime, I receive with pleasure your comments and suggestions.
Ponte di Brenta station
-
Shunter at work into Campo di Marte dismantled freightyard
-
Shunting work
--
PAUDA/PADUE/PADOVA route layout is ready to upload and I hope it will be available at DLS next week.
-
Features:
- Padua Station Central : ten passenger (interactive) tracks
- Padua - Ponte di Brenta commuter service (around 5 Km quad tracks electrified - part of Venice-Padua mainline)
- Padua - Vigodarzere commuter service (around 5 Km single/double electrified tracks - part of Padua-Camposampiero-Castelfranco Veneto-Montebelluna-Feltre-Belluno-Calalzo di Cadore mainline)
- Padua - Mestrino commuter service (around 7 Km double electrified tracks - part of Venice-Padua-Milan-Turin mainline)
- Padua - Abano terme commuter service (around 11 Km double electrified tracks - part of Padua-Bologna mainline)
- Campo di Marte engine sheds and railyard with dismantled freightyard
- Zona Industriale Padova (ZIP) Intermodal Station with freighyards (with interactive industries).
-----
Montericco, with ancient tower.
--
Road above retaining wall, Monselice station yards.
--
Parking lot near Monselice station.
--
With Monselice and Battaglia Terme - along with Montegrotto - my route layout main line reaches 23 Km milestone.
As for reminder, other lines departs from Padua central station: Padua-Mestrino (7 Km), Padua-Ponte di Brenta (4.5 Km) and Padua-Vigodarzere (5 Km).
bongiorno giuseppe.
come sta lei?
i am missing the following for Padua ?
Unknown Location: kuid:109872:1034
Unknown Location: kuid:109872:1053
Unknown Location: kuid:109872:1054
Unknown Location: kuid:109872:1065
not on the dls ??
bongiorno giuseppe.
come sta lei?
i am missing the following for Padua ?
Unknown Location: kuid:109872:1034
Unknown Location: kuid:109872:1053
Unknown Location: kuid:109872:1054
Unknown Location: kuid:109872:1065
not on the dls ??
Buongiorno, Steviez, unfortunately objects above mentioned are outside DLS (and furthermore, obsolete contents, according DLS automatic message). I enclosed them into my layout without evaluation and now users are experiencing troubles with the content. Perhaps, I could send you these objects in a ZIP file with CMP archives.