New Tumbler Ridge Subdivision

mcio34

Oh that's tomatos
hello everyone in these days I will start a project a little bit difficult but there will be daily updates on what I'm doing an electrified route on the bc rail set in 1983 even if possible, the GF6C locomotives:)
 
:(ATTENTION work suspended temporarily due to problems on the hard disk of the PC does not know the time to recover the route:'(
 
Updates For sd40-2

new sd40-2 from jointedrail
:)

39863056014_9802437498_h.jpg
 
New Update and new work

DYqsR7T
Ok but after a period of 4 years I resume this thread saying that since ATSF854 a JR constructor has released in this forum the subdivision of tumbler then I have in mind to finish what atsf854 started
after almost 3 months of work I began to arrange the trees and then to paint the ground
 
hello mcio34, i've also am finishing what ATSF854 started with the Tumbler Sub, its been worked on for only 4 months and is nearing halfway completion
you have finished or not you can post a screen?
but i repaired gf6c the engine spec for working electric sound, lights almost
 
I am impressed with the way the ballast texture perfectly matches the track ballast. Could you tell me what KUIDs and names those are?
 
I am impressed with the way the ballast texture perfectly matches the track ballast. Could you tell me what KUIDs and names those are?
Don't refer to the 2018 photos. The hard drive where the old tumbler sub was is no longer there, as I lost everything on it.
Anyway, after ATSF854 (Matt) released all the material of it subdivision, I started over from what ATSF854 had left. Today I had fun looking through every single file from the GF6-C.
 
Last edited:
Back
Top