I am using PL lumberyard on my route to unload General Goods. In the Consume section the Size is set to 256(default). I set the Rate to 256 and the Initial to 0. I set the Unload value to 256. I have each station set up to unload 1 car in the consist. I do this by setting the station to load/unload 1 car at a time and setting a lengthy time between cars. The consist drives away before the 2nd car can unload. Most of the time this setup works fine.
Occasionally the cars will not unload and occasionally two cars will unload at the same time.
I don't know enough about the workings of ProtoLARs to diagnose the events. What do the values in the Consume and Unload sections mean? If the car doesn't unload does this mean that the station doesn't need goods?
Why would two cars unload at the same time when I've set unload one car at a time?
BTW I set the Produce values to 0.
I have read the tutorials but they don't really explain the operation. I would appreciate any explanation anyone can provide.
Earl
Occasionally the cars will not unload and occasionally two cars will unload at the same time.
I don't know enough about the workings of ProtoLARs to diagnose the events. What do the values in the Consume and Unload sections mean? If the car doesn't unload does this mean that the station doesn't need goods?
Why would two cars unload at the same time when I've set unload one car at a time?
BTW I set the Produce values to 0.
I have read the tutorials but they don't really explain the operation. I would appreciate any explanation anyone can provide.
Earl