A friend of mine has placed a curved dam in his route in 2009, but as he tried to add water, water squares protrude out of the uppermost part of the dam. He tried to set the radius at minimum, so as to use the dam structures to hide the edge of the water but it seems that the minimum size for water squares is 20x20 m. Is there some way to solve this, or should he have to straighten the dam?
Thanks in advance.
Thanks in advance.