Driver_Col
Well-known member
Hi Guys
I have a scenario in which a main line branches out to both a Goods and Main both running parallel until they rejoin later. The plan is the allow the 100mph passenger trains a clear run along that particular stretch while Goods trains travel at their own appropriate speed. The points/switches at both ends of this scenario are defaulted in favour of the main line.
Problem: If a Goods trains gets through the first point/switch first, then it takes priority over the XP Passenger train at the other end of the stretch. i.e. The Passenger train is held at the signal where the lines re-join.
Any ideas why? Any solutions/ideas?
Many thx. Colin.
ps: I am in TC3
I have a scenario in which a main line branches out to both a Goods and Main both running parallel until they rejoin later. The plan is the allow the 100mph passenger trains a clear run along that particular stretch while Goods trains travel at their own appropriate speed. The points/switches at both ends of this scenario are defaulted in favour of the main line.
Problem: If a Goods trains gets through the first point/switch first, then it takes priority over the XP Passenger train at the other end of the stretch. i.e. The Passenger train is held at the signal where the lines re-join.
Any ideas why? Any solutions/ideas?
Many thx. Colin.
ps: I am in TC3
Last edited: