acelejalde
Urban Transit Developers
Elevated Bridges complete!
Just wanted to update everyone on the progress of the content pack! All of the elevated bridges have been finished! Thanks 3ds max for the ease---and to a very special contact within BART (who is on these forums) who shall remain anonymous who gave me the BART documents necessary to get this project going!
So without further ado....
1 Track Bridges:
Depressed Walkway-
Raised Walkway-
Handrail-
No Walkway-
2 Track Bridges:
Raised Walkway-
Depressed Walkway-
Continued below
Just wanted to update everyone on the progress of the content pack! All of the elevated bridges have been finished! Thanks 3ds max for the ease---and to a very special contact within BART (who is on these forums) who shall remain anonymous who gave me the BART documents necessary to get this project going!
So without further ado....
1 Track Bridges:
Depressed Walkway-
Raised Walkway-
Handrail-
No Walkway-
2 Track Bridges:
Raised Walkway-
Depressed Walkway-
Continued below
Last edited: