K4andT1lover
New member
Hi, all.
It's a bit premature, but I was wondering if it possible to have an AI freight consist travel a closed loop, basically forever when in a driving session?
I have a PennCentral mainline crossing over the Bethlehem Branch, and I'd like to set up a freight train to cross back and forth without having to really do anything to it after the initial setup.
Thanks,
Ron
It's a bit premature, but I was wondering if it possible to have an AI freight consist travel a closed loop, basically forever when in a driving session?
I have a PennCentral mainline crossing over the Bethlehem Branch, and I'd like to set up a freight train to cross back and forth without having to really do anything to it after the initial setup.
Thanks,
Ron